The solar plants connected to the power grid shall endeavor to maintain the quality of the voltage waveform at the PCC. The solar power plants shall comply with the requirements specified in Section 5.3 of the Performance Code of the Grid Code and/or the related part in the Electricity Distribution Code.
The PV modules shall conform to the following standards:IS 14286: Crystalline silicon terrestrial photovoltai determine the resistance of PV Modules to Ammonia (NH3)The PV module should have IS14286 qualification certification for solar PV modules (Crystalline silicon terrestrial photovoltaic
The SEGCC specifies the special requirements for connecting both Medium-Scale Solar Plants (MSSPs) and Large-Scale Solar Plants (LSSPs) to the distribution networks or to the transmission network according to the capacity of the solar power plant. The capacity of MSSPs’ range is from 500 kW to less than 20 MW.
The grid protection settings in the solar plants must comply with the requirements stipulated in the SEGCC, unless otherwise agreed with the transmission system operator. At the PCC, the grid protections shall be in compliance with the protection code of the Grid Code .
ms.4. Guidelines for Grid Connected System SizingSolar PV system sizing will be limited by two factors, the amount of physical space available for the installation and the electricity consumption profile of the building (load profile).Current regulations do not provide favourable incentives for systems to fe
It is recommended to refer to the full versions of the concerned codes to comply with detailed grid connection requirements and successful operation of the solar power systems. Academic researchers are advised to follow the requirements of utility codes in performing research works related to integrating solar power plants into grids.