Move and assign Enphase microinverters to the virtual array. Use the Enphase Installer App to scan the battery barcodes and assign them to the site activation. Use the Enphase Installer App to scan the IQ System Controller barcodes and assign them to the site activation. Choose the correct mode on the IQ System Controller to install the IQ Battery.
Only qualified electricians shall install, troubleshoot, or replace the IQ Battery 3T or IQ Battery 10T. The IQ Battery system includes the Enphase IQ Batteries with integrated Enphase IQ Microinverters. The Enphase IQ Gateway measures PV production and home energy consumption.
All installations must comply with national and local electrical codes and standards. Only qualified electricians shall install, troubleshoot, or replace the IQ Battery 3T or IQ Battery 10T. The IQ Battery system includes the Enphase IQ Batteries with integrated Enphase IQ Microinverters.
) Using Enphase Installer App, select Menu > Settings > Battery Storage. Full backup For more information on Operation modes, refer to Storage System Owner’s guide at enphase.com/en-us. If the IQ Battery(ies) are not operating correctly, do the following. If the issue persists, contact Enphase at enphase.com/en-us/support/contact.
) If installing an IQ Battery 10T, install the interconnect cable assembly. Face the front of the batteries, and insert the interconnect cable assembly through the front cable slot from within the field wiring compartment, with the arm of the interconnect cable pointing up, making a “U” shape.
Risk of injury and equipment damage. Do not install more than three IQ Battery 3T units per 20 A branch circuit. ) Place the middle wall-mount bracket on the wall so that the mounting holes of the bracket align with the center of the stud, and the mounting holes on the left and right align with the adjacent studs.