In this paper, the battery energy storage technology is applied to the traditional EV (electric vehicle) charging piles to build a new EV charging pile with integrated charging, discharging, and storage; Multisim software is used to build an EV charging model in order to simulate the charge control guidance module.
Design of Energy Storage Charging Pile Equipment The main function of the control device of the energy storage charging pile is to facilitate the user to charge the electric vehicle and to charge the energy storage battery as far as possible when the electricity price is at the valley period.
Since the smart charging piles are generally deployed in complex environments and prone to failure, it is significant to perform efficient fault diagnosis and timely maintenance for them.
In this article, a real-time fault prediction method combining cost-sensitive logistic regression (CS-LR) and cost-sensitive support vector machine classification (CS-SVM) is proposed. CS-LR is first used to classify the fault data of smart charging piles, then the CS-SVM is adopted to predict the faults based on the classified data.
This DC charging pile and its control technology provide some technical guarantee for the application of new energy electric vehicles. In the future, the DC charging piles with higher power level, high frequency, high efficiency, and high redundancy features will be studied.
The charging pile determines whether the power supply interface is fully connected with the charging pile by detecting the voltage of the detection point. Multisim software was used to build an EV charging model, and the process of output and detection of control guidance signal were simulated and verified.