BY-STEP INSTALLATIONFor Generation 1 Inverters only4A. Connect battery output to the inverter using a lug to plug cable. If not connecting to additional ba lug to the unused socket.For Generation 2 Inverters only4B. Connect battery output to the inverter using a lug to plug cable. If not connecting to additional ba lug
Screw feet in (Optional and to be available in Q4 2021). Place the base at the acceptable position in right way (arrows outward). Stack up battery modules. Insert BMU (make sure the DC MCB is off) and screw. Ltd. All rights reserved. Apply L-bracket to fix the battery to the wall.
Place the base at the acceptable position in right way (arrows outward). Stack up battery modules. Insert BMU (make sure the DC MCB is off) and screw. Ltd. All rights reserved. Apply L-bracket to fix the battery to the wall. Ltd. All rights reserved. 7. Put on the lid and fix it. 8. A completed installation with a battery isolator is shown below.
Battery Settings via local access Go to ‘More’- ‘Setting’ – ‘System Parameters’ to check the system information. Go to ‘More’- ‘Setting’ – ‘Battery Parameters’ to set SOC upper and lower limit if needed (5%-100%by default). Go to ‘More’- ‘Setting’ – ‘Energy Management Parameters’ to set charge/ discharge time if needed.
If it is the first installation of HV battery system, Sungrow advises installers to book the time for remote support. Our team will deliver support when you are on site to avoid any difficult to reach us. Installers need to be cautious for the remote installation. Installer must take responsibility of the after-sales service.
Sungrow recommends that the shaded side of the building would be better to prevent the battery from exposure to the sun, rain, and snow. Battery must not be mounted in direct sunlight as this affects the internal heat, and therefore efficiency of the battery and warranty. Ltd. All rights reserved.