The minimum installation distances for the charging pile are: no less than 700 mm from the back door to the wall, and no less than 500 mm from the side face to the wall. (5) The canopy is built together with the charging pile. (6) This installation method is just a sample for reference.
To start the charging pile, you can swipe your card on the screen and follow the steps that appear. Alternatively, you can go to the 'setting interface', select 'function setting', and choose 'startup mode' set to 'swipe card'.
The charging pile (bolt) should have a good shielding function against electromagnetic interference; ⑤ The bottom of the pile (bolt) body should be fixedly installed on a base not less than 200mm above the ground. The base area should not be larger than 500mm×500mm; 3. Power requirements 4. Electrical requirements
To check the temperature of a charging pile, click on 'temp. displaying' at the system menu page (see figure 9.3.2.2). This will display the real-time temperature of the charging pile inlet/outlet and DC+/DC- of all vehicle connectors.
The AC charging pile (bolt) should comply with IP54 (outdoor), and be equipped with necessary rainproof and sunscreen devices; 7. Three defenses (anti-moisture, anti-mildew, anti-salt spray) protection The printed circuit boards, connectors and other circuits in the charger should be treated with anti-moisture, anti-mildew, and anti-salt spray.
An AC Charging pile is a charging solution for electric cars. It has a body made of brushed stainless steel, which is robust, rigid, anti-rust, and durable. AC Charging piles are ideal for both indoor home charging and public charging. They feature a QR code for mobile payment and standard charging ports for EV cars, E-taxis, and E-buses.