Kindly take note of the following technical requirements during the solar panel production. The color and the size of the cells should be consistent. Be careful with the humidity levels. It should be less than 65% per day. The temperature range should be around 25 ±5. Of course, open the dehumidifiers when necessary.
The audience for this guideline includes solar PV plant owners who perform model validation, and transmission planners who verify validation data and develop interconnection-wide base cases of their planning areas. Each central station solar PV plant (≥ 20 MVA and connected to 60 kV and above) is modeled explicitly in the power flow model.
First, to regulate system design and battery function: IEC 62124 for stand-alone PV system design recommendations and PV performance evaluation (including battery testing and recovery after periods of low state-of-charge) in a variety of climatic conditions, and IEC 62509 for battery charge controllers.
The turbine type of the solar PV generator is set to 31, 32, or 33.6 The turbine type of the battery generator is set to 42. The reactive capability requirement applies to the total solar PV and battery storage generators. The solar PV and battery storage each may not be able to meet the requirement alone.
The modeling guidelines need an update to include lessons learned and consider alignment with the technical requirements. This document examines the representation of BPS-connected solar PV plants in both power flow and dynamic data sets for BPS studies.
At least three regulatory levels for the production, installation, operation and end of life of photovoltaic systems can be considered. Additionally, the Life Cycle Assessment methodology is also regulated by standards. In this chapter, the three levels are presented.