The PV modules shall conform to the following standards:IS 14286: Crystalline silicon terrestrial photovoltai determine the resistance of PV Modules to Ammonia (NH3)The PV module should have IS14286 qualification certification for solar PV modules (Crystalline silicon terrestrial photovoltaic
ms.4. Guidelines for Grid Connected System SizingSolar PV system sizing will be limited by two factors, the amount of physical space available for the installation and the electricity consumption profile of the building (load profile).Current regulations do not provide favourable incentives for systems to fe
The solar array mounting system and connection must be provided with a minimum manufacturing warranty of 10 years. The system must comply with AS/NZS 5033 and Clean Energy Council Installation guidelines.
Standards from this category regulate solar cells (modules) characteristic measurement, solar cells (modules) tests and other standards referring to solar cells (modules) production and testing - production procedure, mechanic or electric photovoltaic module testing, I-U module characteristics measurement etc.
The contractor must provide technical datasheets of the proposed solar PV panels. Preference will be given to panel manufacturers that have an Australian office and employees. Preference given to manufacturers that have Australian based technical support, servicing and warranty claim service.
Although the RERH specification does not set a minimum array area requirement, builders should minimally specify an area of 50 square feet in order to operate the smallest grid-tied solar PV inverters on the market.