The AC charging pile (bolt) should comply with IP54 (outdoor), and be equipped with necessary rainproof and sunscreen devices; 7. Three defenses (anti-moisture, anti-mildew, anti-salt spray) protection The printed circuit boards, connectors and other circuits in the charger should be treated with anti-moisture, anti-mildew, and anti-salt spray.
The charging pile (bolt) should have a good shielding function against electromagnetic interference; ⑤ The bottom of the pile (bolt) body should be fixedly installed on a base not less than 200mm above the ground. The base area should not be larger than 500mm×500mm; 3. Power requirements 4. Electrical requirements
As the electric vehicle charging pile (bolt) on the power distribution side of the power grid, its structure determines that the characteristics of the automatic communication system are many and scattered measured points, wide coverage, and short communication distance.
Charging piles generally provide two charging methods: conventional charging and fast charging. People can use a specific charging card to swipe the card on the human-computer interaction interface provided by the charging pile to perform corresponding charging operations and cost data printing.
Key Considerations: Electrical Supply: Ensure your property or installation site can support the required electrical load, particularly for fast and rapid chargers. Circuit Protection: Adequate circuit protection (e.g., RCDs and MCBs) must be installed in line with safety regulations.
Power Requirement: Typically requires a 125A three-phase connection or higher, depending on the power rating. Charging Speed: Provides 100 miles of range in as little as 10-15 minutes, depending on the vehicle and charger. Suitable For: High-traffic public charging stations, especially along highways and main roads for long-distance travelers.