Based on the Internet of Things technology, the energy storage charging pile management system is designed as a three-layer structure, and its system architecture is shown in Figure 9. The perception layer is energy storage charging pile equipment.
The new energy storage charging pile system for EV is mainly composed of two parts: a power regulation system and a charge and discharge control system. The power regulation system is the energy transmission link between the power grid, the energy storage battery pack, and the battery pack of the EV.
On the one hand, the energy storage charging pile interacts with the battery management system through the CAN bus to manage the whole process of charging.
Due to the urgency of transaction processing of energy storage charging pile equipment, the processing time of the system should reach a millisecond level. 3.3. Overall Design of the System
In order to reduce the operation temperature of the charging pile, this paper proposed a fin and ultra-thin heat pipes (UTHPs) hybrid heat dissipation system for the direct-current (DC) charging pile. The L-shaped ultra-thin flattened heat pipe with ultra-high thermal conductivity was adopted to reduce the spreading thermal resistance.
The main function of the control device of the energy storage charging pile is to facilitate the user to charge the electric vehicle and to charge the energy storage battery as far as possible when the electricity price is at the valley period. In this section, the energy storage charging pile device is designed as a whole.