The Government of Tuvalu worked with the e8 group to develop the Tuvalu Solar Power Project, which is a 40 kW grid-connected solar system that is intended to provide about 5% of Funafuti ’s peak demand, and 3% of the Tuvalu Electricity Corporation's annual household consumption.
Tuvalu's power has come from electricity generation facilities that use imported diesel brought in by ships. The Tuvalu Electricity Corporation (TEC) on the main island of Funafuti operates the large power station (2000 kW).
The ADB project funding announced in November 2019 will increase production of electricity from renewable energy sources from 15% to 32% in Funafuti and from around 70% to over 90% in Tuvalu's outer islands.
The first large scale system in Tuvalu was a 40 kW solar panel installation on the roof of Tuvalu Sports Ground. This grid-connected 40 kW solar system was established in 2008 by the E8 and Japan Government through Kansai Electric Company (Japan) and contributes 1% of electricity production on Funafuti.
It is somewhat complicated because Tuvalu consists of nine inhabited islands. The Tuvalu National Energy Policy (TNEP) was formulated in 2009, and the Energy Strategic Action Plan defines and directs current and future energy developments so that Tuvalu can achieve the ambitious target of 100% renewable energy for power generation by 2020.